Case Study

Committed to building a construction machinery safety digitalization pioneer

Case Study

Wynn Palace Macao Project

The project uses a total of 12 Comansa flat-top tower cranes, of which 7 tower cranes form a tower crane group. To prevent the tower crane group from colliding and to promote safe construction, the project adopts our PM530HK tower crane group anti-collision system. It can monitor the whole process of the working status of the on-site tower crane and judge the risk, effectively avoid the collision among the tower crane group during operation, i.e., avoid collision at the time of cross-operation of many (over 2 sets) tower cranes and guarantee the advancement of the project.

Wynn Palace Macao Project         Wynn Palace Macao Project